Loading...
عربي
Daleel Petroleum · Where we operate

Our Operations in Oman

From the head office in Muscat to the Daleel Oil Field in Al Dhahirah — explore the governorate, our concession areas and the distance between them.

Tap a highlight on the map, or pick one below

515
Muscat → Block 5: ≈ 450 km by road

Concession boundaries are the official outlines published by the Ministry of Energy and Minerals. Dimensions, distances and areas shown on this map are approximate: the boundaries are simplified and flattened onto a plane for display. Sources: concession data from the Ministry of Energy and Minerals · governorate boundaries © OpenStreetMap contributors

Read this map as text
  1. Al Dhahirah Governorate — Al Dhahirah lies in north-western Oman, bordering the Empty Quarter to the south-west and the Al Hajar mountains to the north-east. Its main wilayats are Ibri, Yanqul and Dhank. Both of Daleel Petroleum’s concession areas — Block 5 and Block 15 — sit within this governorate, which makes Al Dhahirah the centre of the company’s field operations.
    • Main wilayat: Ibri
    • Daleel concessions: Block 5 · Block 15
  2. Head Office — Muscat — Daleel Petroleum’s head office is in Muscat, in the Wilayat of Baushar. Corporate, commercial and technical functions are based here, supporting the field operations in Al Dhahirah roughly 450 km to the north-west by road.
    • Governorate: Muscat
    • Wilayat: Baushar
  3. Block 5 — Daleel Oil Field — Block 5 is Daleel Petroleum’s primary operational area and the home of the Daleel Oil Field, about 450 km north-west of Muscat by road and roughly 100 km from Ibri. The concession covers some 992 km² and holds four key oil fields. It has produced since 1981, and under Daleel’s operatorship output rose from around 5,000 barrels per day to more than 50,000.
    • Concession area: 992 km²
    • MEM block name: Wadi Aswad
    • Concession since: 1997
    • Distance from Muscat: ≈ 450 km by road
  4. Block 15 — Block 15 is a second concession in Al Dhahirah, awarded under an exploration and production sharing agreement with Daleel Petroleum as operator. The area covers about 1,389 km². The work programme comprises geological and geophysical studies, reprocessing of existing seismic data, acquisition of new 3D seismic and the drilling of exploration wells to assess the block’s hydrocarbon potential.
    • Concession area: 1,389 km²
    • MEM block name: Jebel Aswad
    • Agreement signed: September 2024
    • Stage: Exploration